uttar pradesh
- supply of control transformer primary voltage 415 volt secondary voltage 230 volt burden 250 va make quantam instrument
- Deadline : 31 Aug 2026
- Updated : 22 Aug 2026
- Value : See Document
uttar pradesh
- supply of control transformer primary voltage 415 volt secondary voltage 230 volt burden 500 va make quantam instrument
- Deadline : 31 Aug 2026
- Updated : 22 Aug 2026
- Value : See Document
uttar pradesh
- supply of control transformer primary voltage 415 volt secondary voltage 18 volt and 24 volt burden 100 va make quantam instrument
- Deadline : 31 Aug 2026
- Updated : 22 Aug 2026
- Value : See Document
uttar pradesh
- supply of new transformer oil conforming to is-335 in non-returnable barrel as per requirement.
- Deadline : 11 Sep 2026
- Updated : 22 Aug 2026
- Value : See Document
uttar pradesh
- supply of first year bdv testing (pre filtration or after filtration) of transformer oil from cpri or authorized dealer/ specialized agency having calibrated bdv testing kit including oil sample collection charges & submission of original test report on t
- Deadline : 11 Sep 2026
- Updated : 22 Aug 2026
- Value : See Document
uttar pradesh
- supply of second year bdv testing (pre filtration or after filtration) of transformer oil from cpri or authorized dealer/ specialized agency having calibrated bdv testing kit including oil sample collection charges & submission of original test report on
- Deadline : 11 Sep 2026
- Updated : 22 Aug 2026
- Value : See Document
uttar pradesh
- supply of dehydration and filtration of transformer oil at site on the basis of the report of pre-bdv check.
- Deadline : 11 Sep 2026
- Updated : 22 Aug 2026
- Value : See Document
uttar pradesh
- cable head termination system with vertical receptacle for 25 kv ac locomotive transformer having 125 sq.mm, 45 kv xlpe coper cable item no.01 to 13 and 15 to 21 in a set rdso sketch nop.skel 4529 spec no. - elrs/spec/bl/0003(rev -1).
- Deadline : 16 Sep 2026
- Updated : 22 Aug 2026
- Value : See Document
uttar pradesh
- repair, maintenance, and installation of plant/systems/equipments (version 2)- repairing & rewinding of transformer cooling fan motors; switchyard; service
- Deadline : 31 Aug 2026
- Updated : 22 Aug 2026
- Value : See Document
rajasthan
- 125 litre capacity(min) transformer oil conditioning and filtration plant ac supply 220-240 v, 50 c/sec conforming to is:6034 along with a pair of hose 10 m long each pulley mobile mounted on welding chasis with pneumatic tyres with leaf spring following
- Deadline : 15 Sep 2026
- Updated : 22 Aug 2026
- Value : See Document
Subscribe / Membership
