andhra pradesh
- repairs and reconditioning of 5 nos 500 kva transformers and repairs to transformer yard in head water works in rmc.
- Deadline : 08 Jan 2026
- Updated : 26 Dec 2025
- Value : 4.18 Lac
andhra pradesh
- supply of 5 kva isolation transformer 3-phase
- Deadline : 14 Jan 2026
- Updated : 24 Dec 2025
- Value : See Document
andhra pradesh
- supply of 5 kva isolation transformer 1-phase
- Deadline : 14 Jan 2026
- Updated : 24 Dec 2025
- Value : See Document
andhra pradesh
- supply of 5 kva auto transformer 3-phase
- Deadline : 14 Jan 2026
- Updated : 24 Dec 2025
- Value : See Document
andhra pradesh
- supply of 25 kv, single phase, outdoor oil filled current transformer of ratio 1500-750/5 a
- Deadline : 22 Jan 2026
- Updated : 24 Dec 2025
- Value : See Document
andhra pradesh
- supply of 50 kva, 25 kv/240 v single phase, oil filled auxiliary transformer
- Deadline : 21 Jan 2026
- Updated : 24 Dec 2025
- Value : See Document
andhra pradesh
- battery charger unit cum pre cooling transformer with stainless steel enclosure 415 volt ac/135 volt dc, 200 amps as per rcf specification no. edts 041, rev.-b.
- Deadline : 21 Jan 2026
- Updated : 23 Dec 2025
- Value : See Document
andhra pradesh
- main transformer 6531 kva, type-abb lot 6500 or similar for wag-9 hc loco as per spec. no-clw/es/3/0456/k or latest.
- Deadline : 21 Jan 2026
- Updated : 23 Dec 2025
- Value : See Document
andhra pradesh
- 33 kv high insulation paint for insulation purpose. di-electric strength 59kv/mmstable up to 200 deg, excellent resistance to uvradiation, excellent resistance to transformer oil, tough and scratch resistant, excellent corrosion resistance, quick drying a
- Deadline : 12 Jan 2026
- Updated : 23 Dec 2025
- Value : See Document
andhra pradesh
- 15th finance commission 2020-2021 - providing of 250 kva transformer at kandaleru reservoir water works
- Deadline : 31 Dec 2025
- Updated : 23 Dec 2025
- Value : 9.47 Lac
Subscribe / Membership
