uttar pradesh
- provn of mobile step down transformer out door type of 315 kva for bhagat line area under ge (u) meerut cantt
- Deadline : 12 Sep 2026
- Updated : 22 Aug 2026
- Value : 9.69 Lac
gujarat
- design, manufacturing, testing, and supply for 500 kva smart mobile transformer unit / power-on-wheels system with 11 kv rmu, lt switchgear, frtu automation, 60 kva online ups, and 50 kwh li-ion battery backup system for emergency power restoration under
- Deadline : 14 Sep 2026
- Updated : 22 Aug 2026
- Value : See Document
uttar pradesh
- differential protection relay (numerical relay) for 400 kv / ict (transformer) for switchyard, laptop for relay
- Deadline : 01 Sep 2026
- Updated : 22 Aug 2026
- Value : See Document
jharkhand
- job. 1 supply and fixing of online ups with battery and constant voltage transformer for rajdhar rail wbs. job.2 supply and fixing of 1.25 kva sw power backup system along with 180 ah battery and trolley for project office under ashok ocp. job. 3 rep
- Deadline : 31 Aug 2026
- Updated : 20 Aug 2026
- Value : See Document
jharkhand
- job. 1 supply and fixing of online ups with battery and constant voltage transformer for rajdhar rail wbs. job.2 supply and fixing of 1.25 kva sw power backup system along with 180 ah battery and trolley for project office under ashok ocp. job. 3 rep
- Deadline : 31 Aug 2026
- Updated : 20 Aug 2026
- Value : See Document
kerala
- electrical maintenance, electrical lt outdoor works, hvac repair, ups service and panel works, transformer and diesel generator
- Deadline : 31 Aug 2026
- Updated : 19 Aug 2026
- Value : 3.97 Lac
jammu & kashmir
- assessment of damages to 2.5 mva, 33/33 kv avr buck-boost transformer at wss tangnar stage-2nd (annexure c)
- Deadline : 24 Aug 2026
- Updated : 17 Aug 2026
- Value : 81 Thousand
uttar pradesh
- under district prayagraj, construction of interlocking road from the house of shyam ji (transformer) in village gadevara to the house of ram kumar kol via pahari
- Deadline : 29 Aug 2026
- Updated : 17 Aug 2026
- Value : 78.91 Lac
tamil nadu
- design, detailed engineering, manufacture, supply of 400/230-110 kv ais substation with auto transformers, switchgears, sas, control room, civilworks and kiosk buildings at samugarengapuram on total turnkey basis under mnre, kfw under gec-ii project
- Deadline : 09 Sep 2026
- Updated : 08 Aug 2026
- Value : See Document
punjab
- provn of two 100 kva three phase online ups with 45 minutes backup time and 160 kva transformer connected connected work under ge (u) bathinda at bathinda mil stn
- Deadline : 24 Aug 2026
- Updated : 01 Aug 2026
- Value : 1.02 Crore
Subscribe / Membership
