jharkhand
- new establishment 500 kva transformer at patherdih coal washery for power supply to bhatdih basti.
- Deadline : 31 Aug 2026
- Updated : 22 Aug 2026
- Value : 2.66 Lac
telangana
- providing dedicated distribution transformer and independent lt electricity service conncetions from tgspdcl for strengthening the power supply system to fim, aicc and press, electronic wing, union bank of india and aicrp on forage crops at ari, pjtau, ra
- Deadline : 28 Aug 2026
- Updated : 22 Aug 2026
- Value : 3.90 Lac
jharkhand
- new establishment 500 kva transformer at patherdih coal washery for power supply to bhatdih basti.
- Deadline : 31 Aug 2026
- Updated : 22 Aug 2026
- Value : 2.66 Lac
jammu & kashmir
- creation of 250 kva transformer along with ht/lt network for providing of power supply to newly construction dormitory building at transit camp allowpora 2.charging of 11 kv transit camp feeder as dedicated feeder from receiving station igc-iii
- Deadline : 08 Sep 2026
- Updated : 17 Aug 2026
- Value : 14.11 Lac
maharashtra
- m and r to barvi water works jambhul providing additional transformer for power supply arrangement with protection system to newly constructed 30 mld pressure filters at wtp premises
- Deadline : 27 Aug 2026
- Updated : 14 Aug 2026
- Value : 40.05 Lac
uttar pradesh
- 25 kv electrification work in connection with provision of auxiliary transformer at interlocking of level crossing gates having more than 20000 tvu under jurisdiction of srdste-i/bsb with rtu power supply arrangement (total 04 nos lc) varanasi division
- Deadline : 02 Sep 2026
- Updated : 14 Aug 2026
- Value : See Document
uttar pradesh
- 25 kv electrification work in connection with provision of auxiliary transformer at interlocking of level crossing gates irrespective of tvu on account of restricted visibility in bsb division with rtu power supply arrangement (total 08 nos lc) vara
- Deadline : 02 Sep 2026
- Updated : 14 Aug 2026
- Value : See Document
chhattisgarh
- supply, installation and commissioning of zig-zag transformer/earthing transformer for use with 7 mva 33 kv/6.6 kv transformer at temporary substation under power supply of gevra project.
- Deadline : 25 Aug 2026
- Updated : 12 Aug 2026
- Value : 6.96 Lac
chhattisgarh
- supply, installation and commissioning of zig-zag transformer/earthing transformer for use with 7 mva 33 kv/6.6 kv transformer at temporary substation under power supply of gevra project.
- Deadline : 25 Aug 2026
- Updated : 12 Aug 2026
- Value : 6.96 Lac
assam
- addn/ altn to old sho complex, provn of commercial power supply for aws site at af stn dinjan and provn of chain link fencing around the transformer and electric distribution pt at nepalipatti of asc bn under ge (af) mohanbari
- Deadline : 28 Aug 2026
- Updated : 10 Aug 2026
- Value : 19.00 Lac
Subscribe / Membership
